Monday, January 6, 2025

Air Canada will have a spot at new JFK terminal in 2026

JFK Millennium Partners (JMP) and Air Canada announced Monday that the airline will operate from the new Terminal 6 (T6) at John F. Kennedy International Airport in 2026. JPM was selected by the Port Authority of New York & New Jersey to build and operate the new terminal at JFK airport.

Air Canada will join fellow Star Alliance partners Lufthansa, SWISS, Austrian Airlines, Brussels Airlines, and ANA at the future terminal.

Terminal 6 is a key component of the Port Authority of New York and New Jersey's $19 billion transformation of JFK into a world-class gateway, with two new terminals, two expanded and modernized terminals, a new ground transportation center, and an entirely new, simplified roadway network.

Air Canada passengers can look forward to T6's digital-first, boutique guest experience, with a less than 5-minute average walk from the TSA security checkpoint exit to all gates,100,000 square feet of NYC-inspired shopping, dining, lounges and amenities, curated public art, sustainable operating features, and a premium guest experience throughout the terminal.

Air Canada Express-Jazz currently operates two daily flights from Toronto and one daily flight from Montreal to JFK Terminal 7 using Embraer E175 aircraft. The JFK service, which has been in place since March 2023, complements Air Canada's existing operations at New York's LaGuardia and Newark Airport, offering passengers a combined total of 36 daily flights between the New York market and Canada.

"We are thrilled that Air Canada has selected T6 as its future home at JFK,” said Steve Thody, JPM CEO. "This decision is also a testament to the close partnership we've built with Air Canada at T7, and we can't wait to strengthen that partnership even further as we welcome Air Canada passengers to our new, state-of-the-art T6 facility.”

"Moving our operation to T6 will improve the airport experience for our customers," said Mark Galardo, executive vice president of Revenue and Network Planning at Air Canada.

About JFK Terminal 6

Currently under construction at John F. Kennedy International Airport, Terminal 6 is being developed in two phases, with the first six gates opening in 2026 and construction completion expected by 2028. Terminal 6 features include:

  • 10 gates, of which nine will accommodate widebody aircraft
  • State-of-the-art automated baggage system, customs/border control facilities, and the latest TSA screening technologies
  • One of the longest departures curbs at JFK, with airline-branded passenger drop-off zones
  • Multiple airline lounges, in addition to a new arrivals lounge
  • A new ground transportation center
  • A curated collection of New York City-inspired artwork featuring local and international artists, curated by the Public Art Fund in partnership with JMP and the Port Authority of New York & New Jersey
  • Sustainably sourced building materials, rooftop solar power, and energy-efficient systems and operating practices throughout the terminal
  • Sustainability certifications for LEED (silver or gold), Envision, and SITES underway

No comments: